Abstract
Mina Jaya Niaga fishing vessel procurement project were unsuccessful. There are 34 planned to be built but only 14 were able to be finished. Through the Minister of Maritime Affairs and Fisheries, the government intended to use the vessels again. Based on the recent survey, Mina Jaya Niaga 11 is one of the five vessels which still worthy to be repaired. The government intended to use the vessel because there is still a potency of tuna fishing in Indonesia. The demand for tuna in the market is growed as Tuna is one of the high-value marine commodity and popular in the world. An economic feasibility study is likely to be conducted to analyze whether the vessel is feasible or not. The capital expenditure, one of the components to be used for feasibility study needed to be examined. The capital expenditure in this project is the estimation cost of the ship refurbishment. Work breakdown structure in order to categorize the vessel repairing aspect is used on this paper to estimating the vessel repair cost. The result of the repair cost is only the shipyard cost and the total man-hour is about 7910 hour.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.