Abstract

The objective of this study was to develop and apply a method for estimating hydroperiods in proposed detention wetlands. We applied the method to a riparian mitigation project in north‐central Texas, USA. The approach used in this study incorporates field measurements of hydrologic variables, historical observations, and digital elevation data – all processed in a geographic information system (GIS) linked to a dynamic water budget model.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.