Abstract

This paper presents a general model—based on the Monte Carlo simulation—for the estimation of power system uncertainties and associated reserve and balancing power requirements. The proposed model comprises wind, PV and load uncertainty, together with wind and PV production simulation. In the first stage of the model, wind speed and solar irradiation are simulated, based on the plant disposition and relevant data. The second stage of the model consists of wind speed, PV power and load forecast error simulation, based on the associated statistical parameters. Finally, both wind and PV forecast error are combined with the load forecast error, resulting in the net uncertainty. This net uncertainty, aggregated on a yearly level, presents a dominant component in balancing power requirements. Proposed model presents an efficient solution in planning phase when the actual data on wind and PV production is unavailable.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.