Abstract

The downtime due to earthquake damage in RC buildings is examined. The rational component of downtime is evaluated based on the results of probabilistic seismic loss assessment analyses, using suitable time estimating manuals for civil construction works. The irrational component of downtime is derived from empirical data relevant to post-earthquake reconstruction in Italy. Suitable criteria are then adopted to monetize the downtime for indirect loss estimation. Finally, a simplified model, expressing indirect monetary loss as a function of the earthquake intensity level, is tentatively proposed, to be incorporated in practice-oriented procedures for the estimation of the expected annual loss of residential RC buildings.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call