Abstract

AbstractWe consider one parametric and five semiparametric approaches to estimate D in SARFIMA (0, D, 0)s processes, that is, when the process is a fractionally integrated ARMA model with seasonality s. We also consider h‐step‐ahead forecasting for these processes. We present the proof of some features of this model and also a study based on a Monte Carlo simulation for different sample sizes and different seasonal periods. We compare the different estimation procedures analyzing the bias, the mean squared error values, and the confidence intervals for the estimators. We also consider three different methods to choose the total number of regressors in the regression analysis for the semiparametric class of estimation procedures. We apply the methodology to the Nile River flow monthly data, and also to a simulated seasonal fractionally integrated time series. Copyright © 2007 John Wiley & Sons, Ltd.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call