Abstract

This document is the fourth sub-report of the EUV AIM design study being conducted at LLNL on behalf of International SEMATECH (ISMT) and addresses the issue of preliminary system costing. The purpose of the LLNL study, as identified in section 1.2 of the statement of work, is to research the basic user requirements of an actinic defect characterization tool, potential design configurations and top-level specifications. The objectives of this design study specifically identified in section 1.3 of the statement of work were to: (1) Determine the user requirements of an actinic defect characterization tool; (2) Determine if an EUV AIM tool is an appropriate platform for actinic defect characterization; (3) Determine possible design configurations and top-level performance specifications; (4) Identify potential technical issues and risks of different technical approaches; (5) Provide estimates of cost relating to different technical approaches; and (6) Provide simulated performance for key subsystems and the entire system. The sub-sections of the study to be addressed were accordingly defined in the statement of work as being: (1) Formulation of top-level specifications; (2) Identification of system configurations suitable for meeting the top-level specifications; (3) Preliminary design of imaging systems; (4) Preliminary design of illumination systems; (5) Prediction and comparison of performance through aerial image calculation; (6) Identification of sub-system requirements; (7) Identification of potential vendors; (8) Estimation of system cost; (9) Identification of technical issues; and (10) Definition of technology transfer or development required. Points 1 to 7 and 9 to 10 are addressed in separate reports to ISMT. This report addresses item 8, system costing, and is provided as a separate report so that its content can be kept confidential at the discretion of ISMT. In this analysis we cost two systems--one based on normal-incidence multilayer-coated optics and another based on zone plate optics. The costing of these two systems are provided separately because the fabrication costs and technical challenges associated with each approach are different in areas relating to optics fabrication, and are highlighted by providing separate costing for the two approaches.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call