Abstract

The potential airborne releases of plutonium (source terms) from postulated damage sustained by the Westinghouse Plutonium Fuel Development Laboratories at the Cheswick site in Pennsylvania as a result of various levels of wind and seismic hazard are estimated. The source terms are based on damage scenarios originated by other specialists and range up to 260 mph for wind hazard and in excess of 0.39 g ground acceleration for seismic hazard. The approaches and factors used to estimate the source terms (inventories of dispersible materials at risk, damage levels and ratios, fractional airborne releases of dispersible materials under stress, atmosphere exchange rates, and source term ranges) are discussed. Source term estimates range from less than 10/sup -7/ g plutonium to greater than 130 g plutonium over a four-day period.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call