In working on a software project the success of the project must begin with the right planning, if planning is wrong it will cause failure and cost overruns will occur. Therefore it is necessary to estimate the right cost to minimize the risk of over-estimates in software projects. Cost estimation in this study uses the Function Point (FP) method which is a method that measures software by measuring the functional perspective of the software to be built. There are 5 components to calculate the FP matrix, namely External Input (EI), External Output (EO), External Inquiry (EI), Internal Logical File (ILF), External File (EIF). From the research that has been done, the estimated cost of developing INLIS LITE 3.0 software, it is concluded that if Perpustakaan Nasional want to develop INLIS LITE 3.0 software, it will require approximately IDR798.906.152 or equivalent to effort 18255,91 man / hour.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.