Abstract
Taiwan completed construction of GNSS reference stations for the network-based RTK system in 2007. The legal mode of operation used in Taiwan requires that each point be repeatedly observed for at least two observation sets separated by 60 min. This study presents a simplified field operating procedure, which measures 10 epochs of fixed solutions during each observation set and reinitializes observations 10 times. In addition, the national and local network-based RTK system were used. The average horizontal positioning accuracies were 1-3. Finally, a workflow is presented for using the network-based RTK to measure the control points in cadastral surveys.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.