Abstract

This research aimed at establishing a baseline using Electromagnetic Distance Measuring Instrument (EDM). Considering the high accuracy of EDM instrument, this will therefore focus on the establishment of baseline in the chosen area (Federal Polytechnic Mubi) to take care of some survey operations that may require the need for a baseline. (Calibrating instruments and establishing first and second order controls). Furthermore, the development of computer programme (FORTRAN 77 language) based on least squares adjustment by observation equation method could provide an efficient method and solution to other problems relating to baseline determination.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.