Abstract

Currently, according to the standard schedule of Uzbekistan Railways JSC, the timing of departure, acceleration, and braking of freight trains is determined uniformly for different weight compositions on each section of the railway track. This, in turn, does not allow for an accurate assessment of the level of utilization of the existing permeability capacity of the railway section. In this study, the impact of accounting for the period of the schedule based on the proportion of freight trains of different weights in the movement schedule is examined with respect to the permeability capacity of railway sections. Uzbekistan Railways JSC has demonstrated that the existing permeability capacity of single-track and double-track railway sections can be increased by 7% and 5%, respectively, under existing operating conditions.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.