Abstract

This paper includes a case study for a baseline condition assessment conducted for the Erie County (N.Y.) Department of Environment & Planning (ECDEP), Division of Sewerage Management (DSM). This project was initiated when the County started looking for more efficient ways to develop their CIP for wastewater facilities, including wastewater treatment plants, pump stations, and collection systems. While the County had previously developed a GIS database for their wastewater collection systems that included information on some of their buried assets, the amount of information available for each of the 77 minisystems (defined as a sewershed or subdivision of a sewer district) varied greatly. For several minisystems there was a significant amount of useful information and for others, there was considerably less information. The baseline condition assessment approach was used to place all minisystems and trunk and interceptors on an equal-footing so that potential projects could be identified and prioritized, while still allowing more detailed information to be added in the future.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.