Abstract

It is very important of high-speed railway construction surveying and mapping. Especially the establishment of construction survey control network and searching aiming at layout, measurement, data processing of adjustment calculation of the horizontal control network and the elevation control network. The most important part is the establishment of CP II and CPIII control network. The elevation control mainly adopts second order leveling. Horizontal and elevation accuracy must to meet the requirements of high speed railway construction survey.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.