Abstract
A new project for the production of a very intense neutrino beam has arisen to enable the discovery of leptonic CP violation and neutrino mass hierarchy. This facility will use the proton linac of the European Spallation Source (ESS) in Lund to deliver the neutrino super beam. The ESS linac is expected to be fully operational at 5 MW power by 2022, producing 2 GeV and 2.86 ms long proton pulses at a rate of 14 Hz. An upgrade of the mean power to 10 MW and a frequency of 28 Hz, in which half is for the neutron beam, is necessary for the production of the neutrino beam. The primary proton beam-line completing the linac will consist of switchyards and accumulator rings. The secondary beam- line producing neutrinos will consist of a four-horn/target station, decay tunnel and beam dump. To detect the produced neutrinos a far megaton scale Water Cherenkov detector will be placed at a baseline of about 500 km in one of the existing mines in Sweden. The elements of the primary and secondary beam-lines and all the possible scenarios impacting the design of the ESSνSB facility as well as the safety issues due to the high irradiation produced are presented and discussed in this paper.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.