Abstract

This paper documents an investigation of drum-buffer-rope (DBR) scheduling and flow control methodology in single-product serial production lines. In particular, DBR flow control is reviewed and the importance of correctly representing this type of flow control mechanism in serial lines is discussed. Departures from valid DBR conceptual and simulation modeling are illustrated. It is shown that the model of a previously published paper is a push system not a DBR system, and that related conclusions regarding protective capacity and constraint location are unsupported. Correct modeling of DBR flow control is shown using discrete simulation experiments that compare the DBR model and a similar push model. Suggestions for additional research are offered.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.