Abstract

Lighting conditions in buildings are verified by experts on a daily basis. Such verifications may be done at several phases in various ways. In the field of daylighting, it is common to make an assessment within the pre-design and in-design phases of a construction work throughout calculations, only rarely by measurements. This approach is the opposite of artificial lighting design, which is done within the in-design phase by calculations and is verified by measurements in post-realization phase. The verification of artificial lighting design is required by the building and public health authority otherwise buildings cannot be approved to use. In the field of daylighting, measurements could be performed as well, nevertheless those are often problematic because regulations usually require fulfilments of the daylight factor which can be determined only under CIE overcast sky. Howbeit, both artificial lighting and daylighting measurements are influenced by many errors, e.g. errors of light measurement instruments, measurement conditions, measurement methods and human factor. The paper is focused on this aspect of lighting design, more specifically on the daylighting measurement errors.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.