Abstract

AbstractOne important issue in the development of complex technical system is the use of rapid simulations to evaluate substructures / surrogate models for system level simulations. For safety‐critical simulations, it is essential to know the error introduced by model order reduction (MOR) used to create the surrogate models to decide whether the simulation can be trusted or not. Typically, a‐priori error estimates, e.g., the sum of neglected singular values in balanced truncation are used. They deliver upper bounds for the error – independently of the applied excitation. By contrast, the error estimates from the reduced basis community deliver a‐posteriori error bounds, which account for the current excitation. These error bounds use the residual between the reduced and original model to derive an error bound. In this work, we review the error bounds used in elastic multibody system (EMBS) described in the floating frame of reference formulation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.