Abstract

We consider a heuristic which has been applied to assign a common due date to a set of n jobs and schedule them on a set of m parallel and identical machines so that the weighted sum of the due date, earliness and tardiness is approximately minimized. We alter the heuristic slightly and show that the revised version is asymptotically optimal as n→∞.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.