Abstract
Erratum to: Supply-based optimal scheduling of oil product pipelines
Highlights
This article is published with open access at Springerlink.com
The online version of the original article can be found under doi:10.1007/S12182-016-0081-x
CNPC Trans-Asia Gas Pipeline Company Ltd., Beijing 100007, China
Summary
Erratum to: Supply-based optimal scheduling of oil product pipelines
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.