Abstract

Erratum to “A Case Study on Stratified Settlement and Rebound Characteristics due to Dewatering in Shanghai Subway Station”

Highlights

  • The typo error that happened in the affiliation has been modified as shown above

  • A complementary expression was added to the second paragraph of Section 2.1 as follows

  • According to the geotechnical investigation report, the simplified geological section of Yishan Road station was shown in Figure 2

Read more

Summary

Introduction

According to the geotechnical investigation report, the simplified geological section of Yishan Road station was shown in Figure 2 (the sandy clay D was actual D2 in original geological report). Erratum Erratum to ‘‘A Case Study on Stratified Settlement and Rebound Characteristics due to Dewatering in Shanghai Subway Station’’

Results
Conclusion
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call