Abstract
Erratum to “A Case Study on Stratified Settlement and Rebound Characteristics due to Dewatering in Shanghai Subway Station”
Highlights
The typo error that happened in the affiliation has been modified as shown above
A complementary expression was added to the second paragraph of Section 2.1 as follows
According to the geotechnical investigation report, the simplified geological section of Yishan Road station was shown in Figure 2
Summary
According to the geotechnical investigation report, the simplified geological section of Yishan Road station was shown in Figure 2 (the sandy clay D was actual D2 in original geological report). Erratum Erratum to ‘‘A Case Study on Stratified Settlement and Rebound Characteristics due to Dewatering in Shanghai Subway Station’’
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have