Abstract
This paper is designed to accomplish two basic objectives. First, the basic data collected to date during the testing of 550-kV pipe-type cable samples at the Waltz Mill Underground Transmission Test Facility is presented in its completeness. Second, sufficient discussion is included concerning the testing procedures, measuring techniques, and problems encountered during testing to permit the reader to fully understand and grasp and significance of the data presented. A lengthy and detailed analysis of the data is not included. Comments of the participating manufacturers will put sample performance into perspective.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.