Abstract
We consider the non-preemptive scheduling problem on identical machines where there is a parameter B and each machine in every unit length time interval can process up to B different jobs. The goal function we consider is the makespan minimization and we develop an EPTAS for this problem. Prior to our work a PTAS was known only for the case of one machine and constant values of B, and even the case of non-constant values of B on one machine was not known to admit a PTAS.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.