Abstract

ABSTRACT A dam's construction always imposes some risks to the environment. In this article, the environmental risks of the Polrood dam, located in a northern province of Iran, during its construction phase, were identified, ranked, and evaluated. The risk factors were initially identified by Delphi questionnaire and then rated using the Technique for Order Preference by Similarity to Ideal Solution (TOPSIS). Subsequently, the Analytical Hierarchy Process (AHP) was applied to classify the risk factors into four major categories, and Expert Choice software was used to weight them. Based on the obtained results, Physicochemical; Biological; Economic, Social, and Cultural; and Health and Safety risks were rated by the weights of 0.124, 0.080, 0.048, and 0.021, respectively. Among the physicochemical risks, Erosion and Sedimentation weighted 0.061 and 0.047, respectively, were identified as the most serious risks. Among the biological risks, the highest negative impact was assigned to Land Cover with the weight of 0.189. In the third category, the most important risk was Population Displacement, weighted 0.114. Workers’ Falls with the weight of 0.109 was also determined as the highest risk in the last category. A comprehensive risk response plan will be required for dealing with the identified risks and their mitigation.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call