Abstract

One of the effective ways to reduce industrial hazardous and toxic wastes is to burn them in the incinerator. Advantages of hazardous and toxic waste incineration cause incinerator business in Indonesian to evolve. Besides, it is triggered by the availability of supporting regulations, such as the Regulation of the State Minister of Environment [1] that allows business people to have licenses to treat hazardous and toxic waste through incinerator. However, the operation of the hazardous and toxic waste incinerator must meet the performance test as regulated by the Government of Indonesia [2], such as destruction removal efficiency (DRE) of principal organic hazardous constituents (POHCs), combustion efficiency, gas residence time, concentration of emitted particulates and heavy metals, HCl and other gaseous pollutants. This paper presents the procedures and results of a case study of the trial burn test (TBT) conducted for the hazardous waste rotary kiln incinerator typically done in Indonesia.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.