Abstract

According to the U.S. Environmental Protection Agency9s (USEPA9s) estimation, asbestos cement (AC) pipe accounts for approximately 15% of the total length of pipe networks for water distribution systems in North America and just as other pipe materials; the AC mains are deteriorating and are in need of attention/renewal. However, there are concerns surrounding the environmental impact of AC pipe renewal that are leading to confusion among the utility managers. The prevailing apprehensions led to the commission of a project to examine the concerns associated with the current pipe renewal practices. While, the first phase of the project examined available pipe renewal practices and the data required to determine the practice9s safety. The second phase of the project focused on demonstrating and evaluating two renewal practices (namely, pipe bursting and cured-in-place pipe (CIPP) renewal methods). The findings from the CIPP demonstration conducted on a 400-mm (16-in) AC water main are presented herein, which point out the CIPP9s applicability to transmission sized AC water mains (i.e. 300-mm or 12-in and larger) and its negligible environmental impact based upon air, soil, and water samples collected onsite.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.