Abstract

A method of increasing the power transmission capacity in the post-emergency mode is considered, when a redundant line is connected to one of the working power transmission lines (LEP) with a voltage of 10 kV using the point of automatic switching on of the reserve (AVR). The effectiveness of such redundancy in most cases turns out to be low due to the limited capacity of trunk sections of mutually reserved lines with smaller cross-sections of wires at the end sections of these lines, which were built as radial lines. This leads to increased losses of active power and voltage, and, as a result, unacceptable deviation of voltage in remote load nodes of the redundant power transmission line. In order to improve the parameters of the operation mode of power transmission, it is proposed to use devices of longitudinal capacitive compensation and reactive power compensation in the scheme of the AVR point. An assessment of the effectiveness of the proposed measure was made.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call