Abstract

Recently improvement of automation systems for electrical power system network became essential for increasing the realiability of power transmission during any disturbance. In a substations the setting of Distance Relays (DRs) are set manually which depends on human experience which may be led to undesirable operation. Any power transmission system may subjected to shortens and loss of adjusting its protection setting, DRs in protection systems are responsible for protected a High voltage transmission lines from short circuit, power swing, and load encroachment, A proposes automation system architecture is introduced to cover the setting and coordination of protection scheme based on DIgSILENT power factory, SIMATIC manger, and WinCC programs.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.