Abstract

One of the most technically challenging activities of the IFMIF facility is the maintenance and the refurbishment of its components, and among these the target system appears to be critical since it is located in the most severe region of neutron irradiation (60 dpa/fpy). Two different target assembly systems have been developed: the first is known as integral target while the second one is based on the so called replaceable backplate bayonet concept. The present remote handling (RH) procedures developed for the refurbishment of the removable backplate foresee the removal of all the components from the upper part of the test cell. This operation has a strong impact on the intervention time for the backplate refurbishment which has to be repeated at least every year. Consequently the need to update the RH strategy for the refurbishment of this component becomes a precondition in order to fulfill the stringent requirement to enhance the duty cycle of IFMIF plant. In this paper two potential approaches are presented: the first relies on the possibility to perform all the refurbishment operations in situ in the test cell cavern, whilst the second one foresees to perform these operations off-line in a hot cell. Advantages and disadvantages of these approaches together with the RH requirements for the refurbishment operations of the backplate bayonet concepts are also reported.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.