Abstract
Most of scheduling methods in the Grid only consider one special attribute of the resource or one aspect of QoS (Quality of Service) of the job. In this paper, we focus on the problem that how to consider two aspects simultaneously. Based on the requirements of the jobs and the attributes of the resources, jobs are categorized into three kinds: CPU-overload, memory-overload, and bandwidth-overload jobs. One job may belong to different kinds according to different attributes. We schedule the jobs in different categories in different orders, and then propose a scheduling method-MTS (multiple attributes scheduling method) to schedule Grid resources. Based on the comparisons between our method, Min-min, ASJS (Adaptive Scoring Job Scheduling), and MRS (Multi-dimensional Scheduling) show: (1) MTS reduces the execution time more than 15% to other methods, (2) MTS improves the number of the finished jobs before the deadlines of the jobs, and (3) MTS enhances the file size of transmitted files (input files and output files) and improves the number of the instructions of the finished jobs.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: KSII Transactions on Internet and Information Systems
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.