Abstract

AbstractWe consider the problem of minimizing the sum of completion times in a two‐machine permutation flowshop subject to release dates. New procedures are proposed for effectively bounding the completion time of a given job that is processed at a given position. New assignment‐based lower bounds are derived as well as an enhanced mathematical programming formulation. Our computational analysis shows a consistent tightness of the proposed lower bounds and a high outperformance of the enhanced mathematical formulation with respect to the classical one.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.