Abstract

The flexibility in transmission networks is not fully utilized in existing energy management systems (EMSs). Corrective transmission switching (CTS) is proposed in this two-part paper to enable EMS to take advantage of the flexibility in transmission systems in a practical way. This paper proposes two EMS procedures: 1) Procedure- A connects real-time security-constrained economic dispatch (RT SCED) with real-time contingency analysis (RTCA), which is consistent with industrial practice; 2) Procedure-B, an enhanced version of Procedure-A, includes CTS in EMS with the proposed concept of branch pseudo limit used in RT SCED. Part-I of this paper presents the methodology while Part-II includes detailed results analysis. It is demonstrated that Procedure-A can effectively eliminate the base case overloads and the potential post-contingency overloads identified by RTCA and Procedure-B can achieve significant congestion cost reduction with consideration of CTS in RT SCED. Numerical simulations also illustrate that integrating CTS into RT SCED would improve social welfare.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.