Abstract

Understanding the behaviour of pressure distribution completed in two layered reservoir subject to both active gas cap and bottom water drive mechanisms is very important in reservoir management. To determine the factors that affect pressure distribution of horizontal wells in a layered reservoir subjected simultaneously with a gas-cap at the top and bottom water drives, well completion was carried out in a particular layer and one of the parameters was varied while the others were kept constant. The results show that the following factors: (i) Wellbore radius (ii) Well Length and (iii) Pay thickness affect pressure distribution in two-layered reservoir subject to both active gas cap and bottom water drive which affect pressure distribution.   Key words: Well, pressure, layer, reservoir, well.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.