Abstract

Notes the importance of new internal supply chains being properly interfaced with the marketplace. Suggests that the appropriate way forward is to design and implement a “leagile supply chain”. Whereas leanness may be achieved by eliminating non‐value added time, agility usually requires the additional reduction of value‐added time via production technology breakthroughs. Demonstrates how the “lean” and “agile” paradigms may be integrated. This requires evaluation of the total performance metric and development of a route map for integrating lean production and agile supply in the total chain. Presents results achieved in a re‐engineered real world supply chain serving the electronic products market.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.