Abstract

Summary Injection and production can cause significant regional uplift or settlement. We analytically evaluate the potential for cement-annulus failure in response to injection-induced deformation in a coupled casing/cement/rock poromechanical vertical-well system. Deformation is calculated with respect to the initial near-wellbore stress state, occurring immediately after cement curing. Tensile-failure and shear-failure lengths along this well are predicted using a stress-development-length method. The analytical model is verified by Abaqus modeling. A sensitivity analysis identifies critical engineering-well-design parameters for ensuring wellbore-annulus integrity.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call