Abstract

Part of Xiping railway south cave temple bridge segments are on easement curve. considering the project time limit and construction difficulties of large span curved bridge, the construction team adopted 64m soffit scaffolding composite column structure to assemble the precasted box girder segments ,this method can better solve the technical problems of nonuniform stress distribution in transverse beam and upright tubes of the bracket. Therefore, this paper introduces in details the bracket structure as well as the key construction technologies of segmental beam rand bracket. the experience can provide good reference for similar engineering.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.