Abstract

A method is developed for calculating the settlement of single double-bladed metallic screw piles in clayey soils for the foundations of temporary buildings. The method is based on the use of a patented design of a screw double-bladed pile and takes account of the nonlinear load dependence of its settlement. It is established that for clayey soils with semi-solid consistency the discrepancy obtained between the experimental final settlements of double-bladed screw piles and the computational data obtained by the proposed method does not exceed 20-30%.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.