Abstract

Capital decision making in LNG is complex both on a commercial level and on a technical level. Managing the engineering and design process is critical to a successful project. This presentation looks at the technology and framework for making those decisions based on sound engineering modelling, estimating and sizing of equipment from the conceptual design into operations. Modelling of the LNG operating processes is a key to maximum throughput at the lowest cost. This overview describes real examples of closed-loop control of the liquefaction process, dynamic simulation of re-gasification for safety and design efficiencies. It will cover how it is done and benefits achieved.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.