Abstract

Summary The Gordon Dam is a double curvature concrete arch structure 140 m high, forming part of a hydro-electric scheme. The dam is sited on folded and faulted Precambrian quartzite. Driving adits was favoured over diamond drilling in siting the dam and for detailed investigations to prove the stability of the foundations. Considerable excavation on the left abutment was necessary to remove unfavourable rock and a continuous pre-split face of 122 m was produced. The geological conditions found during excavation were better than anticipated thus raising the computed factor of safety.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.