Abstract

Benten-yama tunnel, about 1.3km long, is located near by Kozu, South-West of the Oiso hill land mainly consisted of diluvium-tertiary formations. Along the tunnel site, the hill is chiefly constituted by alternation of sand gravel beds and tuffaceous mudstone beds.Because of the existence of the unconsolidated sand gravel beds with much poor water enclosed by impermeable mudstone beds, pilot tunnel is often damaged by collapse with see page water. The maximum total tunnel water abount to 8400l/min. Relations between the geological conditions and the amount of the tunnel water are discussed in this paper.By the methods of the roundabout pilot tunnel driving at the collapse points, the pilot tunnel finished in Dec. 1961, and the tunnel completed in June.1962.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.