Abstract

Abstract In this paper a process of determination of methodological component of power distribution engineering factors of the macrocode MOBY-DICK (MD) is presented. This process is based on a direct comparison of measured and calculated data. The directly measured data analyzed in this article are thermocouple (TC) and Rhodium self-powered neutron detector (SPND) readings. Also the normality of deviations between measured and calculated TC temperature rises is discussed and methodological uncertainties of the macrocode MD are then checked by 97.5th percentile. Absolute and relative uncertainties of volumetric (KV) and radial (Kq) power distributions are determined by the comparisons of power distributions calculated by MD code with either power distributions provided by the Dukovany NPP core monitoring system (SCORPIO) or with power distributions obtained from direct TC and SPND readings. Final determination of engineering factors supposes hyperbolic dependence of MD methodological uncertainties on power peaking.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.