Abstract
This study developed an engineering consulting project budget allocation and control model based on baseline productivity of staff of various positions for each work item. The research model included two modules, namely the staff budget and time budget. The staff budget module determined the working hours and budgets of staff of various positions for each work item of the new project. The time budget module is to plan an implementation period and budget allocation for each work item of the new project. Four findings were inferred from the obtained results. First, the control chart method was an appropriate method for determining the baseline productivity of engineering consulting project. Second, the root mean square error (RMSE) of the staff budget module was 1.99 – 2.81 NT$/m, and the budget allocation results obtained with this module were similar to those produced by experienced project managers. Third, the RMSE of the time budget module was 2.23%, which is more accurate than are existing practical methods. Fourth, the accuracy of the budget stress index proposed by this study was 81.48%–84.00%. This index can assist project managers in determining projects, work items, and cost control benchmarks for staff working at various positions.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.