Abstract
The 14 November 2016 Kaikōura earthquake resulted in long duration shaking in excess of the code demand for many buildings with fundamental periods between 1 and 2 seconds in Wellington, particularly in those parts of the city where shaking has been amplified due to basin effects and deeper deposits, notably in the port area or Thorndon basin.
 This paper outlines the initial response of engineers and the engineering assessment processes undertaken in Wellington in the weeks following the Kaikōura Earthquake, along with the technical support provided to Wellington City Council through the establishment of the Critical Buildings Team and the Wellington Engineering Leadership Group. An overview is provided of the Targeted Assessment Programme subsequently undertaken by Wellington City Council to look more closely at the buildings most likely to be affected. Background is provided to the key elements of the Targeted Damage Evaluation Guidelines that were developed in support of this programme, including the relationship with the Detailed Engineering (Damage) Evaluation process used following the Canterbury Earthquake Sequence.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Bulletin of the New Zealand Society for Earthquake Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.