Abstract

Abstract In recent years, South Africa has encountered a critical electricity supply which necessitated the implementation of demand-side management (DSM) projects. Load shifting and energy (EE) efficiency projects were introduced in mining sector to reduce the electricity usage during day peak time. As the compressed air networks and the water pumping systems are using large amounts of the mines’ electricity, possible ways were investigated and implemented to improve and optimise the energy consumption and to reduce the costs. Implementing DSM and EE in four different mines resulted in achieving the desired energy savings and load-shifting.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.