Abstract

Construction reorganization, as a type of construction of high-rise buildings, is a part of a basic reorganization cycle. Features of renovation of built-up areas and issues of energy modeling are considered. The experience of assessing the efficiency of quality management systems for the organizational structures of construction management and common approaches to solving this issue are currently insufficient. Loft style methodology is used: the integrated performance indicator of organizational and technological operational reliability (OTOR) in high-rise construction. The possibilities of the construction method using 3D printing technology are considered. Comparative analysis of cost indicators for the construction of walls made of concrete blocks with plaster, brick cladding and ApisCor technology is made. These circumstances allow formulating the scientific task of the study. On the basis of the well-known BIM technology for information modeling of objects, a bank (information base) of standard implementation plans (IP) is created, from which the most rational IP for this type of work is selected using the criteria research method based on modified genetic algorithms (GA). The issues of choosing a method of construction work by the totality of implementation plans of construction and installation works are considered.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call