Abstract

The volatility of photovoltaic (PV) power generation affects its schedulability and friendly grid connection. Energy storage as a highly flexible and controllable regulation resource is regarded as a key technical means to smooth PV power output. This paper proposes a BESS power and capacity determination method based on the definition of maximum PV power volatility and gives an empirical formula for determining the energy storage capacity under different levels of PV output volatility. Furthermore, the determination of BESS under different maximum power volatility constraints and installed capacity of PV plants is also studied. It provides a reference for the actual energy storage planning with different renewable energy penetration levels, which is conducive to the friendly grid connection and dispatch of renewable energy power generation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.