Abstract

The article describes the research on the improvement of the temporary ditch digger device. In order to reduce the traction resistance of the channel and improve the channel quality, two straight discs are installed in front of the channel. During the, the slope of the temporary ditch was maintained at the required level due to the partial disintegration of the soil layer due to the rotational movement of the disc, and the issue of maintaining the uniformity of the temporary ditch - side wall was discussed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.