Abstract

DC microgrids are becoming integral part of a modern power system due to the growing penetration of DC distributed energy resources and loads, with additional advantages in terms of power quality improvement. They can be used for remote area electrification including villages, mountains, and islands. In this paper, an islanded DC microgrid is considered as a case study for islands with tidal energy potential, which consists of renewable energy resources including solar, wind and tidal, along with Li-ion battery storage. To ensure the efficient operation, an optimal energy management system is proposed for resource scheduling and utilization. In this regard, this paper proposes a two-stage supervisory energy management system for optimal operation of PV/Wind/Tidal microgrid with one-time communication to avoid excessive use of communication bandwidth in real-time. The primary stage schedules the optimal energy share from each energy source thereby enhancing the efficiency of the operation. The secondary stage updates the decision strategies by analyzing aggregated scheduled generation and demand profiles to ensure an effective utilization. The proposed energy management model has been experimentally validated to prove its effectiveness in achieving optimized operation for an islanded DC microgrid. Word Count: 4380

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.