Abstract

Evaporative drying of lignite is an energy intensive process. In this study, the heat pump is integrated with a lignite drying system to decrease the energy consumption rate of lignite drying. The performance of heat pump drying is energetically and exergetically evaluated with developed models. Results show that the power consumption rates to dehydrate 1 kg of water from raw lignite in the heat pump drying system without and with lignite preheater are 660.82 and 585.62 kJ (kg H2O)−1, respectively. Exergetic analysis indicates that most exergy is destructed in the condenser and the evaporator in the heat pump drying. The case of lignite-to-electricity process (i.e., a lignite-fired power plant integrated with heat pump drying) is studied to examine additional benefits of heat pump drying to the downstream industrial processes that consume dried lignite. Thermodynamic and economic models are developed. Net efficiency of the lignite-to-electricity process can be increased by 1.4 and 1.57 percentage points for heat pump drying without and with lignite preheater, respectively. Preliminary economic analysis shows that the integration of heat pump drying without and with lignite preheater can earn additional 1.42 and 1.73 million USD, respectively. The influences of drying system and heat pump parameters are also analyzed.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call