Abstract

Abstract The distillation tower’s reboiler is one of the largest energy consumers in petrochemical facilities, and reducing its energy consumption is a crucial issue. This study proposes two optimal methods, namely Direct Vapor Recompression (DVR) and External Vapor Recompression (EVR), to reduce the consumption of cold and hot utilities in a petrochemical deethanizer tower. The Pars petrochemical in Iran is taken as a case study, and the proposed methods are compared with the base case using energy, exergy, and economic approaches, simulated through Aspen HYSYS software in the steady-state design conditions. Exergy analysis reveals that the EVR and DVR methods reduce the exergy destruction of the deethanizer tower by about 70.06 % and 67.29 %, respectively, compared to the base case. Moreover, the EVR method allows for complete recycling of low-pressure vapor, reducing the total exergy destruction rate from 0.871 to 0.261 GJ/tethane. The feed separation cost for the base case, DVR, and EVR are estimated to be around 28 $/kgfeed, 21.57 $/kgfeed, and 21.14 $/kgfeed, respectively. The EVR method results in reduced utility and ethane separation cost rates from 5.153 to 3.274 $/tethane and 17.64 to 15.78 $/year. Overall, the findings suggest that both DVR and EVR methods are effective in reducing the energy consumption and costs associated with deethanizer tower operations. Moreover, real-time optimization techniques can be developed to monitor and adjust the deethanizer tower’s operating parameters, such as feed flow rate, reboiler duty, and reflux ratio.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call