Abstract

AbstractWe give an efficient algorithm for solving the following scheduling problem to optimality: Assign n jobs to m processors such that they all meet a common deadline T and energy consumption is minimized by appropriately controlling the clock frequencies of the processors. Jobs are malleable, i.e., their amount of parallelism can be flexibly adapted. In contrast to previous work on energy efficient scheduling we allow more realistic energy consumption functions including a minimum and maximum clock frequency and a linear term in energy consumption. We need certain assumptions on the speedup function of the jobs that we show to apply for a large class of practically occurring functions.KeywordsSchedule ProblemEnergy FunctionEnergy UsageFrequency ScalingBend PointThese keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call